如题,想在后院做一个deck,材料什么的大概需要多少呢?labor呢?
我还在考虑concret好还是deck好呢?deck是不是要刷漆的啊?还有deck的寿命能使用
多长时间?
女生,对这些完全没有概念,请各位指点指点
我还在考虑concret好还是deck好呢?deck是不是要刷漆的啊?还有deck的寿命能使用
多长时间?
女生,对这些完全没有概念,请各位指点指点
h*n
3 楼
从买回来开始apple tv2 就经常说 This content requires HDCP for playback,重启
apple tv也没用 HDMIcable也重新插了。我们的三星电视去年才买的,HDMI cable也是
从apple店买的。有人也有这个问题吗?
apple tv也没用 HDMIcable也重新插了。我们的三星电视去年才买的,HDMI cable也是
从apple店买的。有人也有这个问题吗?
P*r
12 楼
找了个contractor,给我的报价是给现在的patio加上screen,然后在后面加一个12*11
的deck,包工包料,1300,材料大概500多,怎么这么便宜呢?
的deck,包工包料,1300,材料大概500多,怎么这么便宜呢?
f*l
14 楼
"怎么这么便宜呢?" Then tip them more later! But $1300 can do some big work.
- People can use $1300 to hire other to install about 500 sf of purgo floor.
- I used $1300 and hired a contractor to tear off a 400 sf of flat roof, and
then install a new sloppy roof and new gut with two downspouts. (3 people
for 2 days + all materials). They also repaired some wood damages under the
old flat roof.
11
【在 P********r 的大作中提到】
: 找了个contractor,给我的报价是给现在的patio加上screen,然后在后面加一个12*11
: 的deck,包工包料,1300,材料大概500多,怎么这么便宜呢?
- People can use $1300 to hire other to install about 500 sf of purgo floor.
- I used $1300 and hired a contractor to tear off a 400 sf of flat roof, and
then install a new sloppy roof and new gut with two downspouts. (3 people
for 2 days + all materials). They also repaired some wood damages under the
old flat roof.
11
【在 P********r 的大作中提到】
: 找了个contractor,给我的报价是给现在的patio加上screen,然后在后面加一个12*11
: 的deck,包工包料,1300,材料大概500多,怎么这么便宜呢?
P*r
16 楼
倒不是说1300不能做什么多事情,是看到别人的报价,怕这个里面有猫腻。
work.
floor.
and
the
【在 f********l 的大作中提到】
: "怎么这么便宜呢?" Then tip them more later! But $1300 can do some big work.
: - People can use $1300 to hire other to install about 500 sf of purgo floor.
: - I used $1300 and hired a contractor to tear off a 400 sf of flat roof, and
: then install a new sloppy roof and new gut with two downspouts. (3 people
: for 2 days + all materials). They also repaired some wood damages under the
: old flat roof.
:
: 11
work.
floor.
and
the
【在 f********l 的大作中提到】
: "怎么这么便宜呢?" Then tip them more later! But $1300 can do some big work.
: - People can use $1300 to hire other to install about 500 sf of purgo floor.
: - I used $1300 and hired a contractor to tear off a 400 sf of flat roof, and
: then install a new sloppy roof and new gut with two downspouts. (3 people
: for 2 days + all materials). They also repaired some wood damages under the
: old flat roof.
:
: 11
r*9
19 楼
一般建议拿到纸质offer之后研究一下再negotiate.
a*t
22 楼
后院基本是和房子的的地板是平的
that means a deck is probably not a good choice as
wooden deck needs to be off the ground to reduce water damage,
and you don't want to step up to a deck from inside.
My choice would be to get a patio, maybe pour concrete
and top it off with slate.
that means a deck is probably not a good choice as
wooden deck needs to be off the ground to reduce water damage,
and you don't want to step up to a deck from inside.
My choice would be to get a patio, maybe pour concrete
and top it off with slate.
P*r
24 楼
嗯,倒是没考虑过这个问题,我这里是南方,的确雨水很多,那看来还是patio比较好
。
。
g*n
25 楼
我LD以前遇见过,理由是他们招人的方向(侧重点)变了.