avatar
这点活$3000,贵吗?# Money - 海外理财
D*B
1
Outside-Broom sweep front and rear porch, remove nest and replace missing
soffit wood with same kind near the front door and paint (make this match
exactly as the other soffit), remove all trash near rear deck and in rear
yard, install new outside vent for gas fireplace, Inside-Install new small
mini blind on side light of front door, install new smoke detector batteries
t/o, clean all non-carpeted floors t/o, vac all carpets t/o, replace light
bulbs t/o as needed, steam clean carpets t/o including stairs and closets (
all rooms), clean all baseboard trim t/o in all rooms, Garage-Re-key entry
garage door to match front door, clean floors and remove all boxes and trash
, Foyer-Touch up paint 3-4 spots on walls, clean space above front door and
below window that's up high, Living Room-Remove long spider webs, Dining
Room-Install missing light switch knob, Kitchen-Clean stove and refrigerator
inside/outside/underneath, repair garbage disposal by using jamb buster or
alan wrench, clean microwave, tighten water faucet on osmosis system that is
loose, remove paint from side of upper cabinets next to sink, clean/drywall
repair and re-texture ceiling and paint white (make this professional),
clean inside/outside all countertops/sink/cabinets/drawers, clean and spot
paint pantry door trim white, re-secure existing base cabinet toe kick
molding and replace missing pieces next to dishwasher on both sides, Family
Room-Drywall repair ceiling in corner and 1 qty nail pop and re-texture/
paint to match, Hallway (upstairs)-Paint walls upstairs to downstairs
similar color or paint yellow to match the rest of the home, clean spider
webs, install new smoke detector in place of missing one, Hallway (
downstairs)-Clean and touch up paint 2-3 spots on wall, Master Bedroom-Spot
paint ceiling corners and wall at top same colors, vac and clean carpets in
closet, install vertical blind handle at patio door, paint white base trim
left of patio door to entry door white, Master Bathroom-Spot paint ceiling
corners and walls at top same colors (paint is in garage), spot paint window
trim, spot paint base trim t/o bathroom, 2nd Bedroom (rear left)-Spot paint
door jamb, clean/drywall repair all walls and paint similar color, clean
and paint closet, spot paint sliding doors, remove mattress, install 1 qty
smoke detector inside room above door on wall, 3rd Bedroom (front middle)-
Paint all walls, install missing screen, install 1 qty smoke detector inside
room above door on wall, install new window ledge caulk and paint white,
caulk outside of window (make sure no leaks) (not sure why window ledge is
getting wet, I think it was due to window not being closed properly causing
condensation over the years maybe?), 4th Bedroom (front right, pink)-Clean
walls, clean and paint window ledge white, spot paint closet walls, install
1 qty smoke detector inside room above door on wall, 2nd Bathroom-Clean
inside/outside all cabinets/countertops/sink/mirror/shower/tub/commode,
install missing exhaust fan light cover, remove old toilet from home, 3rd
Bathroom (1/2 bath downstairs)-Clean sink/mirror/commode, Office Den (
downstairs)-Install 2 qty mini blinds in place of old broken ones, clean all
built in cabinets inside/outside.
Install new 3rd bedroom carpeting (front middle) with same color and like
kind that has several bleach markings and 1qty burn mark.
avatar
d*3
2
应该按干了多长时间来算吧。。。你是房东还是租客啊?
avatar
n*9
3
这么长一般人不会有耐心看,你也不简明扼要介绍下,自己贪图方便人家怎么帮你
相关阅读
logo
联系我们隐私协议©2024 redian.news
Redian新闻
Redian.news刊载任何文章,不代表同意其说法或描述,仅为提供更多信息,也不构成任何建议。文章信息的合法性及真实性由其作者负责,与Redian.news及其运营公司无关。欢迎投稿,如发现稿件侵权,或作者不愿在本网发表文章,请版权拥有者通知本网处理。