Note 3 root以后手贱安装了OTA update# PDA - 掌中宝
i*a
1 楼
【 以下文字转载自 Military2 讨论区 】
发信人: idoba (turen), 信区: Military2
标 题: 造谣的,无知起哄的,哄抢盐糖醋的,担心出门被雨淋得辐射的
发信站: BBS 未名空间站 (Sat Mar 19 13:26:02 2011, 美东)
核电业: 和平利用核能还是将来一个热点,如何处理核废料,核事故提供了教训,将来会更安全的。
给造谣的: 别再散播恐慌了,事态完全控制住了,和我几天前预测一致
无知起哄的:多学点知识,无知不是错,因为无知而乱说话就是你的错了
哄抢盐糖醋的:别给奸商再送钱了
担心出门被雨淋的:别担心了,该干么干嘛去,和平常一样
http://ansnuclearcafe.org/
No New Developments since 9:00pm, 19th March
Unit Status
1 • Reactor cold shutdown, stable water level, offsite power is
available.
• No cooling water is leaked to the reactor containment vessel.
• Maintain average water temperature at 100°C in the pressure
restraint.
2 • Reactor cold shutdown, stable water level, offsite power is
available.
• No cooling water is leaked to the reactor containment vessel.
• Maintain average water temperature at 100°C in the pressure
restraint.
3 • Reactor cold shutdown, stable water level, offsite power is
available.
• No cooling water is leaked to the reactor containment vessel.
• Maintain average water temperature at 100°C in the pressure
restraint.
4 • Reactor cold shutdown, stable water level, offsite power is
available.
• No cooling water is leaked to the reactor containment vessel.
• Maintain average water temperature at 100°C in the pressure
restraint.
other• In the Unit 1, 2, 3 and 4, which automatically shut down due
to the Tohoku-Chihou-Taiheiyo-Oki Earthquake on March 11th, 2011,
we had been preparing measures for decreasing the pressure of each
reactor containment vessel since March 12th. However, on March
17th, we released such preparation in all of the Units.
发信人: idoba (turen), 信区: Military2
标 题: 造谣的,无知起哄的,哄抢盐糖醋的,担心出门被雨淋得辐射的
发信站: BBS 未名空间站 (Sat Mar 19 13:26:02 2011, 美东)
核电业: 和平利用核能还是将来一个热点,如何处理核废料,核事故提供了教训,将来会更安全的。
给造谣的: 别再散播恐慌了,事态完全控制住了,和我几天前预测一致
无知起哄的:多学点知识,无知不是错,因为无知而乱说话就是你的错了
哄抢盐糖醋的:别给奸商再送钱了
担心出门被雨淋的:别担心了,该干么干嘛去,和平常一样
http://ansnuclearcafe.org/
No New Developments since 9:00pm, 19th March
Unit Status
1 • Reactor cold shutdown, stable water level, offsite power is
available.
• No cooling water is leaked to the reactor containment vessel.
• Maintain average water temperature at 100°C in the pressure
restraint.
2 • Reactor cold shutdown, stable water level, offsite power is
available.
• No cooling water is leaked to the reactor containment vessel.
• Maintain average water temperature at 100°C in the pressure
restraint.
3 • Reactor cold shutdown, stable water level, offsite power is
available.
• No cooling water is leaked to the reactor containment vessel.
• Maintain average water temperature at 100°C in the pressure
restraint.
4 • Reactor cold shutdown, stable water level, offsite power is
available.
• No cooling water is leaked to the reactor containment vessel.
• Maintain average water temperature at 100°C in the pressure
restraint.
other• In the Unit 1, 2, 3 and 4, which automatically shut down due
to the Tohoku-Chihou-Taiheiyo-Oki Earthquake on March 11th, 2011,
we had been preparing measures for decreasing the pressure of each
reactor containment vessel since March 12th. However, on March
17th, we released such preparation in all of the Units.