avatar
g*n
1
Academic writing 3: Three methods to develop a coherent paragraph
avatar
t*y
2
一般6个月吗?
如果RFE的话一般需要不超过多长时间补材料?
thanks
avatar
K*y
3
ROOFING
1.The flashing(s) at the chimney should be sealed to avoid leaks.
EXTERIOR
1.Possible wood deterioration was noted to the siding and/or trim. The
client should refer to the wood destroying pest and organism report (pest
report) for all locations of wood deteriorations.
2.Safety glass etchings were not observed on the glass of the door(s) at the
garage side door. Safety glass is required for glass doors and is generally
identified by an etching in the corner of the glass pane.
3.The overhead garage door opener did not automatically reverse under
resistance to closing. There is a serious risk of injury, particularly to
children, under this condition. The opener should have its tension adjusted
or may need replacement
4.There is evidence of rot at the exposed ends of the beam(s) at the back
patio. This part of the beam(s) typically is not load bearing but if not
corrected this condition can become worse
PLUMBING
1.The bathtub faucet handles and spout at the hallway bathroom is/are
leaking.
2. The sink(s) at the master bathroom was/were observed to drain slowly or
not at all. This condition should be further evaluated by a plumber.
ELECTRICAL
1.The main distribution panel is obstructed and is not easily accessible in
an emergency. This issue should be corrected
大家说说看哪几个是大问题?或是修起来很贵的(>$1000)?谢谢
avatar
i*t
4
无伪币一身轻
avatar
v*1
5
Hooyou律师楼最近的统计好像是210天 for niw-140。
不知道是不是tsc和nsc的平均。如果是平均而且你的case是由tsc处理,那等待时间可
能会更长。

【在 t****y 的大作中提到】
: 一般6个月吗?
: 如果RFE的话一般需要不超过多长时间补材料?
: thanks

avatar
K*y
6
明天就要和seller negotiate了,大家帮帮忙,看看哪些维修项目比较贵或是修起来麻
烦的?我可以让seller修其中一部分,剩下的我以后再找人修理。再次谢过!
avatar
b*t
7
re

【在 i******t 的大作中提到】
: 无伪币一身轻
avatar
r*r
8
我是11月初递交的,nsc,也还没有消息。
avatar
K*y
9
不好意思,顶一下!
avatar
b*6
10
re
avatar
t*y
11
这么长啊,我的是tsc


【在 v********1 的大作中提到】
: Hooyou律师楼最近的统计好像是210天 for niw-140。
: 不知道是不是tsc和nsc的平均。如果是平均而且你的case是由tsc处理,那等待时间可
: 能会更长。

avatar
s*f
12
plumbing的维修会比较贵

the
generally

【在 K*******y 的大作中提到】
: ROOFING
: 1.The flashing(s) at the chimney should be sealed to avoid leaks.
: EXTERIOR
: 1.Possible wood deterioration was noted to the siding and/or trim. The
: client should refer to the wood destroying pest and organism report (pest
: report) for all locations of wood deteriorations.
: 2.Safety glass etchings were not observed on the glass of the door(s) at the
: garage side door. Safety glass is required for glass doors and is generally
: identified by an etching in the corner of the glass pane.
: 3.The overhead garage door opener did not automatically reverse under

avatar
c*y
13
re

【在 i******t 的大作中提到】
: 无伪币一身轻
avatar
p*r
14
我当年DIY的NIW是4个月就批了,NSC。
avatar
K*y
15
谢谢你的回复,给你发了包子

【在 s*********f 的大作中提到】
: plumbing的维修会比较贵
:
: the
: generally

avatar
z*6
16
re

【在 i******t 的大作中提到】
: 无伪币一身轻
avatar
t*y
17
能知道当年是哪年啊?

【在 p********r 的大作中提到】
: 我当年DIY的NIW是4个月就批了,NSC。
avatar
b*7
18
【ROOFING
1.The flashing(s) at the chimney should be sealed to avoid leaks.
$100
EXTERIOR
1.Possible wood deterioration was noted to the siding and/or trim. The
client should refer to the wood destroying pest and organism report (pest
report) for all locations of wood deteriorations.
$100 or more
2.Safety glass etchings were not observed on the glass of the door(s) at the
garage side door. Safety glass is required for glass doors and is generally
identified by an etching in the corner of the glass pane.
3.The overhead garage door opener did not automatically reverse under
resistance to closing. There is a serious risk of injury, particularly to
children, under this condition. The opener should have its tension adjusted
or may need replacement
$150
4.There is evidence of rot at the exposed ends of the beam(s) at the back
patio. This part of the beam(s) typically is not load bearing but if not
corrected this condition can become worse
$100?
PLUMBING
1.The bathtub faucet handles and spout at the hallway bathroom is/are
leaking.
DIY $20
2. The sink(s) at the master bathroom was/were observed to drain slowly or
not at all. This condition should be further evaluated by a plumber.
$20-$2000
ELECTRICAL
1.The main distribution panel is obstructed and is not easily accessible in
an emergency. This issue should be corrected
avatar
a*o
19
re

【在 i******t 的大作中提到】
: 无伪币一身轻
avatar
l*2
20
我们是12年6月底交的,13年2月中收到的approve notice。 无RFE。
avatar
s*a
21
都不是问题,1000刀还扯落半天,还不够伤和气的
avatar
i*t
22
over了 前三位
谢谢大家吃包子
avatar
p*r
23
2013年4月递交,当年8月批

【在 t****y 的大作中提到】
: 能知道当年是哪年啊?
avatar
s*i
24
Re
avatar
t*y
25
4个月,好快!

【在 p********r 的大作中提到】
: 2013年4月递交,当年8月批
avatar
x*c
26
这种数量级的包子永远抢不到

【在 i******t 的大作中提到】
: 无伪币一身轻
avatar
y*j
27
TSC 现在大概 8-12 个月, 根据 cases reported @ trackitt.com

【在 t****y 的大作中提到】
: 4个月,好快!
avatar
g*n
28
sigh

【在 x****c 的大作中提到】
: 这种数量级的包子永远抢不到
avatar
i*1
29
2013年交的,无PP,29-30天批的,TSC。弱case.
感觉这个完全看运气
avatar
c*y
30
啦啦啦

【在 x****c 的大作中提到】
: 这种数量级的包子永远抢不到
avatar
m*e
31
我也是12月初递的,现在也没任何消息。大家都加油吧。
avatar
U*S
32
一同事去年十月底递的,今年四月份Apporved。NSC.

【在 t****y 的大作中提到】
: 一般6个月吗?
: 如果RFE的话一般需要不超过多长时间补材料?
: thanks

avatar
G*s
33
我是去年9月底递交的,Tsc,也还没有消息。等吧。
相关阅读
logo
联系我们隐私协议©2024 redian.news
Redian新闻
Redian.news刊载任何文章,不代表同意其说法或描述,仅为提供更多信息,也不构成任何建议。文章信息的合法性及真实性由其作者负责,与Redian.news及其运营公司无关。欢迎投稿,如发现稿件侵权,或作者不愿在本网发表文章,请版权拥有者通知本网处理。