Y*H
2 楼
看了一处房子,内部还算满意,唯一问题是后院草地有20-30度左右的坡通向woods (照片
最右边树后面就是woods). 我担心的问题是,以后有小孩的话没有户外playground.
我的问题是,如果想把deck加长加宽到目前6-8倍的面积用做室外活动空间可行么?工程有
多大, 需要多少投入? 下面的草地用处理么?
房子在PA.
谢谢!
最右边树后面就是woods). 我担心的问题是,以后有小孩的话没有户外playground.
我的问题是,如果想把deck加长加宽到目前6-8倍的面积用做室外活动空间可行么?工程有
多大, 需要多少投入? 下面的草地用处理么?
房子在PA.
谢谢!
v*r
3 楼
房子没那么大,做那么大的DECK太不配套了。现在的草地挺好的呀,虽然有点斜,小孩
玩也够了。做你说的那么大的DECK估计要花几万刀。
玩也够了。做你说的那么大的DECK估计要花几万刀。
c*o
5 楼
楼主以为deck好玩吗?以后刷漆累死你
G*h
8 楼
$300 for 100sqrt hehe
http://www.amazon.com/Waterproofing-PEWTER-Acrylic-Coating-Roll
【在 c****o 的大作中提到】![](/moin_static193/solenoid/img/up.png)
: 有这种东西?给个link吧,老夫没几年需要耍deck一次,现在年纪大了,快耍不动了
http://www.amazon.com/Waterproofing-PEWTER-Acrylic-Coating-Roll
【在 c****o 的大作中提到】
![](/moin_static193/solenoid/img/up.png)
: 有这种东西?给个link吧,老夫没几年需要耍deck一次,现在年纪大了,快耍不动了
g*9
12 楼
You need to read or check with HOA first.
Once they approve the plan, you can start the build.
Over the years, I have added lots of decks, it is not that hard to do. Put
in the post is most work, but you can contract that part out.
If you plan to do everything yourself, you need the right tools, renting an
auger to dig all the holes.
I used laser to project a grid on the area first, mark all the hole spot
with little flags, I rented a PTO auger for my tractor for a day, dug all
the holes.
Rented a cement pump truck for an hour, poured all the holes, use a vibrator
to get rid off any air bubbles. A few days later, I put up the all the
posts with some help. Use level to double check they are perfectly verticle.
I used laser again to mark and trim all the posts to same height. Built
frame work, I pre drill all the holes first.
All above can be contracted out at about 1/2 to 1/3 of the deck price if too
hard for you to do.
Putting up is boards easy but labor intensive, but you can do it yourself to
save money.
If you want to contract the whole deck out, check to see if any deck
contractor in your area advertise a fixed price. I have found a few in my
area only charge $3000 per deck (any size), but you supply all the materials
. Maybe that is the way to go for you.
程有
【在 Y*H 的大作中提到】![](/moin_static193/solenoid/img/up.png)
: 看了一处房子,内部还算满意,唯一问题是后院草地有20-30度左右的坡通向woods (照片
: 最右边树后面就是woods). 我担心的问题是,以后有小孩的话没有户外playground.
: 我的问题是,如果想把deck加长加宽到目前6-8倍的面积用做室外活动空间可行么?工程有
: 多大, 需要多少投入? 下面的草地用处理么?
: 房子在PA.
: 谢谢!
Once they approve the plan, you can start the build.
Over the years, I have added lots of decks, it is not that hard to do. Put
in the post is most work, but you can contract that part out.
If you plan to do everything yourself, you need the right tools, renting an
auger to dig all the holes.
I used laser to project a grid on the area first, mark all the hole spot
with little flags, I rented a PTO auger for my tractor for a day, dug all
the holes.
Rented a cement pump truck for an hour, poured all the holes, use a vibrator
to get rid off any air bubbles. A few days later, I put up the all the
posts with some help. Use level to double check they are perfectly verticle.
I used laser again to mark and trim all the posts to same height. Built
frame work, I pre drill all the holes first.
All above can be contracted out at about 1/2 to 1/3 of the deck price if too
hard for you to do.
Putting up is boards easy but labor intensive, but you can do it yourself to
save money.
If you want to contract the whole deck out, check to see if any deck
contractor in your area advertise a fixed price. I have found a few in my
area only charge $3000 per deck (any size), but you supply all the materials
. Maybe that is the way to go for you.
程有
【在 Y*H 的大作中提到】
![](/moin_static193/solenoid/img/up.png)
: 看了一处房子,内部还算满意,唯一问题是后院草地有20-30度左右的坡通向woods (照片
: 最右边树后面就是woods). 我担心的问题是,以后有小孩的话没有户外playground.
: 我的问题是,如果想把deck加长加宽到目前6-8倍的面积用做室外活动空间可行么?工程有
: 多大, 需要多少投入? 下面的草地用处理么?
: 房子在PA.
: 谢谢!
Y*H
13 楼
Thanks! This is definitely helpful.
Roughly speaking, how much do you think the material will cost?
an
vibrator
【在 g*****9 的大作中提到】![](/moin_static193/solenoid/img/up.png)
: You need to read or check with HOA first.
: Once they approve the plan, you can start the build.
: Over the years, I have added lots of decks, it is not that hard to do. Put
: in the post is most work, but you can contract that part out.
: If you plan to do everything yourself, you need the right tools, renting an
: auger to dig all the holes.
: I used laser to project a grid on the area first, mark all the hole spot
: with little flags, I rented a PTO auger for my tractor for a day, dug all
: the holes.
: Rented a cement pump truck for an hour, poured all the holes, use a vibrator
Roughly speaking, how much do you think the material will cost?
an
vibrator
【在 g*****9 的大作中提到】
![](/moin_static193/solenoid/img/up.png)
: You need to read or check with HOA first.
: Once they approve the plan, you can start the build.
: Over the years, I have added lots of decks, it is not that hard to do. Put
: in the post is most work, but you can contract that part out.
: If you plan to do everything yourself, you need the right tools, renting an
: auger to dig all the holes.
: I used laser to project a grid on the area first, mark all the hole spot
: with little flags, I rented a PTO auger for my tractor for a day, dug all
: the holes.
: Rented a cement pump truck for an hour, poured all the holes, use a vibrator
s*i
14 楼
this look like 5% grade.
a 30 degrees slope is like a cliff.
a 30 degrees slope is like a cliff.
相关阅读
求助国内特价华侨旅行团的细节在美国有银行账户,但人不在美国需要报税吗? (转载)First-time home buyer可以把401 k里面的钱提出来吗?有谁听说过seller financing要不要买房求推荐:家用翻箱倒柜爬高用什么工具杀螃蟹草的最佳季节是什么时候?急救:刚搬家遭遇bed bug!! (转载)这个难道不是杂草吗?Appraisal report 一般几天出来请问多少钱修理Chipped flooring in the pool. 泳池大概300sqft.ceiling 漏水浅色皮沙发是不是太容易脏Property tax不同的屋子铺什么类型的地毯有无讲究?美国这边的雷达对付蚂蚁是不是很一般呀!请教虫子达人推荐一个Jersey City的closing律师吧 (转载)Mulch上长了很多小草怎么办??关于Pre-forclosure