大家帮我参详一下这个装修报价单~~ 是否靠谱?# Living
w*2
1
LZ在南加,General Contractor 是个越南人,有license有bond,手下干活的有劳模,
有越南人。同事推荐的,
现在基本上分成这几大块:
电:装Recessed light, 60刀一个,包材料,我只要买灯泡即可。
铺地板,我只要他出人工,我买材料。安装 $1.3/sf
楼上铺地毯:包工包料,$3/sf, 一个旋转楼梯外加$450.
4" Base molding, 包工包料$1.5/ft
6“Crown molding, 包工包料 $5/ft
换个Patio door,换框的那种, 包工包料 $1500, 具体什么牌子的门我还没问。
换4个窗,有大有小,平均 $250 一个,
刷漆:2700尺,1.85/ft,包括刷顶,和一个loft的大的build in 的 装饰架。3个厕所
除墙纸。
外加一个楼梯刷漆$1200, 这个是不是贵了?
avatar
w*2
2
接下来是一个厨房:
厨房 $7,950.00
Cabinet per plan - Standard choice material cost only 4,500.00
Labor cabinet installation cost 650.00
plywood with material and labor installed 150.00
Granite standard choice with 6" backplash and Island -standard choice
materials cost 750.00
Labor installation granite installation with 6" backplash only - 1,250.00
Reinstalled plumbing - customer provide sinks/faucet cost 350.00
Reinstalled all appliances/stove/ref/hood labor only 300.00
avatar
w*2
3
主卧浴室 $6850
Remodeling per plan - Walkin shower - No Tub
Check Framing per inspection - replace minor damaged as needed
New Framing as need for build walkin shower - labor and materials as need
Hotmop water proof per planed - price with material and labor included
Rough material included - paper/wonderboard for tile installation
Replace new tile inside the shower only - MATERIALS AND LABOR INCLUDED
Replace toilet as need - LABOR ONLY
Replace existing electrical fixture such as lighting or existed Exhauted fan
as need - LABOR ONLY
Reinstalled standard shower door only - LABOR INCLUDED ONLY
NOT INCLUDED INSTALLATION FOR CUSTOM FRAMLESS SHOWER DOOR
Customer provide shower faucets/tub/accessories as needed
Contractor provide tile/rought materials and labor work.
Price included tile 4' around the tub area and full inside the shower area -
tile and all labor work included
Customer provide Exhauted fan to be installed
Price included installed for floor - standard choice materials cost
另一个小浴室 $3,750.00
Complete bathroom remodeling with Tub - Customer provide bathtub
Check Framing per inspection - replace minor damaged as needed
New Framing as need for build walkin shower - labor and materials as need
Hotmop water proof per planed - price with material and labor included
Rough material included - paper/wonderboard for tile installation
Replace new tile inside the shower only -MATERIALS AND LABOR INCLUDED
Replace toilet as need - LABOR ONLY
Replace existing electrical fixture such as lighting or existed Exhauted fan
as need - LABOR ONLY
Reinstalled standard shower door only - LABOR INCLUDED ONLY
NOT INCLUDED INSTALLATION FOR CUSTOM FRAMLESS SHOWER DOOR
Customer provide shower faucets/tub/accessories as needed
Contractor provide tile/rought materials and labor work
2 granite counter top with standard choice granite with 6" backplash
Labor installation for 2 granite 2 sinks
Labor reinstalled plumbing
Customer provide faucets to be reinstalled
avatar
w*2
4
找了3个contractor 来估,2个没回。也不知道什么意思~~
现在从班上看来,不确定的是浴室装修一般要多少钱?就是主卧,全部换掉?
avatar
c*o
5
60一个灯?好便宜,太发指了
avatar
w*2
6
真的么?麻烦斑竹再看看其他的项目,给点意见,看还能有多少价可以砍,现在总价在
4w多,真心有点受不了。。。

【在 c****o 的大作中提到】
: 60一个灯?好便宜,太发指了
avatar
w*m
7
还可以了,南加也就这个价了,你什么都要换,当然要4万,
主厕我建议你上TRAVERTINE的SHOWER墙面,天然石头看着比TILE高大上很多
avatar
w*2
8
好的,查了一下是挺好看的。谢谢。 contractor说工期在40天,按照这些是快了还是
慢了?

【在 w*****m 的大作中提到】
: 还可以了,南加也就这个价了,你什么都要换,当然要4万,
: 主厕我建议你上TRAVERTINE的SHOWER墙面,天然石头看着比TILE高大上很多

avatar
w*m
9
40天肯定做不完,60天可能还差不多,他们要能40天做完,奖他们2000刀
你要自己盯着看,每周都要检查,不能做甩手先生

【在 w******2 的大作中提到】
: 好的,查了一下是挺好看的。谢谢。 contractor说工期在40天,按照这些是快了还是
: 慢了?

avatar
c*o
10
那个昨天来问装修价格的同学可以参考一下这个包夹
avatar
w*2
11
看他们的project,他们经常做那些商业建筑,比如指甲店什么的,越南人你懂的。。。
所以人手还是比较充足的,如果签约的话要注意什么?我知道要分期付款,1/3每次?
还有什么要注意的?

【在 w*****m 的大作中提到】
: 40天肯定做不完,60天可能还差不多,他们要能40天做完,奖他们2000刀
: 你要自己盯着看,每周都要检查,不能做甩手先生

avatar
w*2
12
在他那个帖子我也说了。。估计他看见了

【在 c****o 的大作中提到】
: 那个昨天来问装修价格的同学可以参考一下这个包夹
avatar
w*m
13
这个你就不懂了吧,就是最好的CONTRACTOR也是烂尾的,到后面就去接别的活去了
这样保证一直有活干,大工程很少有按时完成的,你比如SHOWER DOOR,三家来看
都不愿意做,三周才有一个ESTIMATE,还需要10天才能装上

。。

【在 w******2 的大作中提到】
: 看他们的project,他们经常做那些商业建筑,比如指甲店什么的,越南人你懂的。。。
: 所以人手还是比较充足的,如果签约的话要注意什么?我知道要分期付款,1/3每次?
: 还有什么要注意的?

avatar
w*2
14
也有道理,那我就算他60天吧。

【在 w*****m 的大作中提到】
: 这个你就不懂了吧,就是最好的CONTRACTOR也是烂尾的,到后面就去接别的活去了
: 这样保证一直有活干,大工程很少有按时完成的,你比如SHOWER DOOR,三家来看
: 都不愿意做,三周才有一个ESTIMATE,还需要10天才能装上
:
: 。。

avatar
m*g
15
厨房厕所我懒得看了。
你列的其他的,都是非常便宜的。
另外地毯,patio door窗什么的,肯定给你最便宜的东西。
molding他们给你上漆吗?

【在 w******2 的大作中提到】
: LZ在南加,General Contractor 是个越南人,有license有bond,手下干活的有劳模,
: 有越南人。同事推荐的,
: 现在基本上分成这几大块:
: 电:装Recessed light, 60刀一个,包材料,我只要买灯泡即可。
: 铺地板,我只要他出人工,我买材料。安装 $1.3/sf
: 楼上铺地毯:包工包料,$3/sf, 一个旋转楼梯外加$450.
: 4" Base molding, 包工包料$1.5/ft
: 6“Crown molding, 包工包料 $5/ft
: 换个Patio door,换框的那种, 包工包料 $1500, 具体什么牌子的门我还没问。
: 换4个窗,有大有小,平均 $250 一个,

avatar
w*2
16
谢谢,那我现在心里就是对厨房和浴室还没谱,如果我主卧浴室再换成Framless
shower door,要快1w刀了。

【在 m******g 的大作中提到】
: 厨房厕所我懒得看了。
: 你列的其他的,都是非常便宜的。
: 另外地毯,patio door窗什么的,肯定给你最便宜的东西。
: molding他们给你上漆吗?

avatar
w*2
17
嗯,门窗的牌子我还要问问,什么牌子是比较中间价格的?Simonton?
molding 有包括上漆。

【在 m******g 的大作中提到】
: 厨房厕所我懒得看了。
: 你列的其他的,都是非常便宜的。
: 另外地毯,patio door窗什么的,肯定给你最便宜的东西。
: molding他们给你上漆吗?

avatar
c*o
18
俺得省还行

【在 w******2 的大作中提到】
: 嗯,门窗的牌子我还要问问,什么牌子是比较中间价格的?Simonton?
: molding 有包括上漆。

avatar
w*2
19
啥是俺得省?

【在 c****o 的大作中提到】
: 俺得省还行
avatar
c*o
20
Anderson

【在 w******2 的大作中提到】
: 啥是俺得省?
avatar
w*2
21
Got it

【在 c****o 的大作中提到】
: Anderson
avatar
i*e
22
我觉得便宜的。灯我问的老中都要80一个。你这个开关多少钱?地板要问清楚是怎么装
的,下面垫什么材料。板子长短大小也有不同吧。你做那么多,4万不贵。关键是要质
量保证。
L Z请短一下contractor的联系方式,我年底也想装修一下。

【在 w******2 的大作中提到】
: LZ在南加,General Contractor 是个越南人,有license有bond,手下干活的有劳模,
: 有越南人。同事推荐的,
: 现在基本上分成这几大块:
: 电:装Recessed light, 60刀一个,包材料,我只要买灯泡即可。
: 铺地板,我只要他出人工,我买材料。安装 $1.3/sf
: 楼上铺地毯:包工包料,$3/sf, 一个旋转楼梯外加$450.
: 4" Base molding, 包工包料$1.5/ft
: 6“Crown molding, 包工包料 $5/ft
: 换个Patio door,换框的那种, 包工包料 $1500, 具体什么牌子的门我还没问。
: 换4个窗,有大有小,平均 $250 一个,

avatar
w*2
23
地板的话,既然是我出材料,垫什么也是我来提供啦,这价钱里有很多东西没包括的,
比如买浴缸,马桶,灯具。。。一般装修都是这样的吧?

【在 i*****e 的大作中提到】
: 我觉得便宜的。灯我问的老中都要80一个。你这个开关多少钱?地板要问清楚是怎么装
: 的,下面垫什么材料。板子长短大小也有不同吧。你做那么多,4万不贵。关键是要质
: 量保证。
: L Z请短一下contractor的联系方式,我年底也想装修一下。

avatar
w*2
24
LZ在南加,General Contractor 是个越南人,有license有bond,手下干活的有劳模,
有越南人。同事推荐的,
现在基本上分成这几大块:
电:装Recessed light, 60刀一个,包材料,我只要买灯泡即可。
铺地板,我只要他出人工,我买材料。安装 $1.3/sf
楼上铺地毯:包工包料,$3/sf, 一个旋转楼梯外加$450.
4" Base molding, 包工包料$1.5/ft
6“Crown molding, 包工包料 $5/ft
换个Patio door,换框的那种, 包工包料 $1500, 具体什么牌子的门我还没问。
换4个窗,有大有小,平均 $250 一个,
刷漆:2700尺,1.85/ft,包括刷顶,和一个loft的大的build in 的 装饰架。3个厕所
除墙纸。
外加一个楼梯刷漆$1200, 这个是不是贵了?
avatar
w*2
25
接下来是一个厨房:
厨房 $7,950.00
Cabinet per plan - Standard choice material cost only 4,500.00
Labor cabinet installation cost 650.00
plywood with material and labor installed 150.00
Granite standard choice with 6" backplash and Island -standard choice
materials cost 750.00
Labor installation granite installation with 6" backplash only - 1,250.00
Reinstalled plumbing - customer provide sinks/faucet cost 350.00
Reinstalled all appliances/stove/ref/hood labor only 300.00
avatar
w*2
26
主卧浴室 $6850
Remodeling per plan - Walkin shower - No Tub
Check Framing per inspection - replace minor damaged as needed
New Framing as need for build walkin shower - labor and materials as need
Hotmop water proof per planed - price with material and labor included
Rough material included - paper/wonderboard for tile installation
Replace new tile inside the shower only - MATERIALS AND LABOR INCLUDED
Replace toilet as need - LABOR ONLY
Replace existing electrical fixture such as lighting or existed Exhauted fan
as need - LABOR ONLY
Reinstalled standard shower door only - LABOR INCLUDED ONLY
NOT INCLUDED INSTALLATION FOR CUSTOM FRAMLESS SHOWER DOOR
Customer provide shower faucets/tub/accessories as needed
Contractor provide tile/rought materials and labor work.
Price included tile 4' around the tub area and full inside the shower area -
tile and all labor work included
Customer provide Exhauted fan to be installed
Price included installed for floor - standard choice materials cost
另一个小浴室 $3,750.00
Complete bathroom remodeling with Tub - Customer provide bathtub
Check Framing per inspection - replace minor damaged as needed
New Framing as need for build walkin shower - labor and materials as need
Hotmop water proof per planed - price with material and labor included
Rough material included - paper/wonderboard for tile installation
Replace new tile inside the shower only -MATERIALS AND LABOR INCLUDED
Replace toilet as need - LABOR ONLY
Replace existing electrical fixture such as lighting or existed Exhauted fan
as need - LABOR ONLY
Reinstalled standard shower door only - LABOR INCLUDED ONLY
NOT INCLUDED INSTALLATION FOR CUSTOM FRAMLESS SHOWER DOOR
Customer provide shower faucets/tub/accessories as needed
Contractor provide tile/rought materials and labor work
2 granite counter top with standard choice granite with 6" backplash
Labor installation for 2 granite 2 sinks
Labor reinstalled plumbing
Customer provide faucets to be reinstalled
avatar
w*2
27
找了3个contractor 来估,2个没回。也不知道什么意思~~
现在从班上看来,不确定的是浴室装修一般要多少钱?就是主卧,全部换掉?
avatar
c*o
28
60一个灯?好便宜,太发指了
avatar
w*2
29
真的么?麻烦斑竹再看看其他的项目,给点意见,看还能有多少价可以砍,现在总价在
4w多,真心有点受不了。。。

【在 c****o 的大作中提到】
: 60一个灯?好便宜,太发指了
avatar
w*m
30
还可以了,南加也就这个价了,你什么都要换,当然要4万,
主厕我建议你上TRAVERTINE的SHOWER墙面,天然石头看着比TILE高大上很多
avatar
w*2
31
好的,查了一下是挺好看的。谢谢。 contractor说工期在40天,按照这些是快了还是
慢了?

【在 w*****m 的大作中提到】
: 还可以了,南加也就这个价了,你什么都要换,当然要4万,
: 主厕我建议你上TRAVERTINE的SHOWER墙面,天然石头看着比TILE高大上很多

avatar
w*m
32
40天肯定做不完,60天可能还差不多,他们要能40天做完,奖他们2000刀
你要自己盯着看,每周都要检查,不能做甩手先生

【在 w******2 的大作中提到】
: 好的,查了一下是挺好看的。谢谢。 contractor说工期在40天,按照这些是快了还是
: 慢了?

avatar
c*o
33
那个昨天来问装修价格的同学可以参考一下这个包夹
avatar
w*2
34
看他们的project,他们经常做那些商业建筑,比如指甲店什么的,越南人你懂的。。。
所以人手还是比较充足的,如果签约的话要注意什么?我知道要分期付款,1/3每次?
还有什么要注意的?

【在 w*****m 的大作中提到】
: 40天肯定做不完,60天可能还差不多,他们要能40天做完,奖他们2000刀
: 你要自己盯着看,每周都要检查,不能做甩手先生

avatar
w*2
35
在他那个帖子我也说了。。估计他看见了

【在 c****o 的大作中提到】
: 那个昨天来问装修价格的同学可以参考一下这个包夹
avatar
w*m
36
这个你就不懂了吧,就是最好的CONTRACTOR也是烂尾的,到后面就去接别的活去了
这样保证一直有活干,大工程很少有按时完成的,你比如SHOWER DOOR,三家来看
都不愿意做,三周才有一个ESTIMATE,还需要10天才能装上

。。

【在 w******2 的大作中提到】
: 看他们的project,他们经常做那些商业建筑,比如指甲店什么的,越南人你懂的。。。
: 所以人手还是比较充足的,如果签约的话要注意什么?我知道要分期付款,1/3每次?
: 还有什么要注意的?

avatar
w*2
37
也有道理,那我就算他60天吧。

【在 w*****m 的大作中提到】
: 这个你就不懂了吧,就是最好的CONTRACTOR也是烂尾的,到后面就去接别的活去了
: 这样保证一直有活干,大工程很少有按时完成的,你比如SHOWER DOOR,三家来看
: 都不愿意做,三周才有一个ESTIMATE,还需要10天才能装上
:
: 。。

avatar
m*g
38
厨房厕所我懒得看了。
你列的其他的,都是非常便宜的。
另外地毯,patio door窗什么的,肯定给你最便宜的东西。
molding他们给你上漆吗?

【在 w******2 的大作中提到】
: LZ在南加,General Contractor 是个越南人,有license有bond,手下干活的有劳模,
: 有越南人。同事推荐的,
: 现在基本上分成这几大块:
: 电:装Recessed light, 60刀一个,包材料,我只要买灯泡即可。
: 铺地板,我只要他出人工,我买材料。安装 $1.3/sf
: 楼上铺地毯:包工包料,$3/sf, 一个旋转楼梯外加$450.
: 4" Base molding, 包工包料$1.5/ft
: 6“Crown molding, 包工包料 $5/ft
: 换个Patio door,换框的那种, 包工包料 $1500, 具体什么牌子的门我还没问。
: 换4个窗,有大有小,平均 $250 一个,

avatar
w*2
39
谢谢,那我现在心里就是对厨房和浴室还没谱,如果我主卧浴室再换成Framless
shower door,要快1w刀了。

【在 m******g 的大作中提到】
: 厨房厕所我懒得看了。
: 你列的其他的,都是非常便宜的。
: 另外地毯,patio door窗什么的,肯定给你最便宜的东西。
: molding他们给你上漆吗?

avatar
w*2
40
嗯,门窗的牌子我还要问问,什么牌子是比较中间价格的?Simonton?
molding 有包括上漆。

【在 m******g 的大作中提到】
: 厨房厕所我懒得看了。
: 你列的其他的,都是非常便宜的。
: 另外地毯,patio door窗什么的,肯定给你最便宜的东西。
: molding他们给你上漆吗?

avatar
c*o
41
俺得省还行

【在 w******2 的大作中提到】
: 嗯,门窗的牌子我还要问问,什么牌子是比较中间价格的?Simonton?
: molding 有包括上漆。

avatar
w*2
42
啥是俺得省?

【在 c****o 的大作中提到】
: 俺得省还行
avatar
c*o
43
Anderson

【在 w******2 的大作中提到】
: 啥是俺得省?
avatar
w*2
44
Got it

【在 c****o 的大作中提到】
: Anderson
avatar
i*e
45
我觉得便宜的。灯我问的老中都要80一个。你这个开关多少钱?地板要问清楚是怎么装
的,下面垫什么材料。板子长短大小也有不同吧。你做那么多,4万不贵。关键是要质
量保证。
L Z请短一下contractor的联系方式,我年底也想装修一下。

【在 w******2 的大作中提到】
: LZ在南加,General Contractor 是个越南人,有license有bond,手下干活的有劳模,
: 有越南人。同事推荐的,
: 现在基本上分成这几大块:
: 电:装Recessed light, 60刀一个,包材料,我只要买灯泡即可。
: 铺地板,我只要他出人工,我买材料。安装 $1.3/sf
: 楼上铺地毯:包工包料,$3/sf, 一个旋转楼梯外加$450.
: 4" Base molding, 包工包料$1.5/ft
: 6“Crown molding, 包工包料 $5/ft
: 换个Patio door,换框的那种, 包工包料 $1500, 具体什么牌子的门我还没问。
: 换4个窗,有大有小,平均 $250 一个,

avatar
w*2
46
地板的话,既然是我出材料,垫什么也是我来提供啦,这价钱里有很多东西没包括的,
比如买浴缸,马桶,灯具。。。一般装修都是这样的吧?

【在 i*****e 的大作中提到】
: 我觉得便宜的。灯我问的老中都要80一个。你这个开关多少钱?地板要问清楚是怎么装
: 的,下面垫什么材料。板子长短大小也有不同吧。你做那么多,4万不贵。关键是要质
: 量保证。
: L Z请短一下contractor的联系方式,我年底也想装修一下。

avatar
i*a
47