B*n
2 楼
呵呵,
一下一上啊
推荐optionhouse:实时的买卖盘,实时的option。
http://oh.tellapal.com/a/clk/sX4PM
commission $3.95 for stock and $5 for option,100个free trade,minimum
deposit:$2000
一下一上啊
推荐optionhouse:实时的买卖盘,实时的option。
http://oh.tellapal.com/a/clk/sX4PM
commission $3.95 for stock and $5 for option,100个free trade,minimum
deposit:$2000
s*r
3 楼
麻痹的所以足球不行啊,小鸡崽子也有这么多粉
B*F
4 楼
ding, since I am watching the caas
m*y
5 楼
前者在不考虑基本面的情况下,我觉得有戏,在收盘的时候看看,如果能维持可以考虑
进一步分。后者,个人觉得回调势在必行,有点危险。
进一步分。后者,个人觉得回调势在必行,有点危险。
B*F
12 楼
Learned. thanks
B*n
13 楼
scok 一直文章呢!
m*i
14 楼
主席, 现在进TDCP晚不晚啊?
E*y
15 楼
主席,看看cak怎么样?可以跟进不?
CAMAC Energy is pleased to announce the spudding and progress of its ZJS-3
well in China. Drilling is expected to take between 40 and 60 days to reach
the well’s target depth of between 4,500 and 5,500 feet. Currently the
penetrating depth is 3,300 feet drilled towards the main target formations.
Mud logs have already shown gas readings from several penetrated intervals.
【在 m**********i 的大作中提到】![](/moin_static193/solenoid/img/up.png)
: 主席, 现在进TDCP晚不晚啊?
CAMAC Energy is pleased to announce the spudding and progress of its ZJS-3
well in China. Drilling is expected to take between 40 and 60 days to reach
the well’s target depth of between 4,500 and 5,500 feet. Currently the
penetrating depth is 3,300 feet drilled towards the main target formations.
Mud logs have already shown gas readings from several penetrated intervals.
【在 m**********i 的大作中提到】
![](/moin_static193/solenoid/img/up.png)
: 主席, 现在进TDCP晚不晚啊?
E*y
17 楼
sold,45% gain. 继续关注~~~
reach
.
【在 E*********y 的大作中提到】![](/moin_static193/solenoid/img/up.png)
: 主席,看看cak怎么样?可以跟进不?
: CAMAC Energy is pleased to announce the spudding and progress of its ZJS-3
: well in China. Drilling is expected to take between 40 and 60 days to reach
: the well’s target depth of between 4,500 and 5,500 feet. Currently the
: penetrating depth is 3,300 feet drilled towards the main target formations.
: Mud logs have already shown gas readings from several penetrated intervals.
reach
.
【在 E*********y 的大作中提到】
![](/moin_static193/solenoid/img/up.png)
: 主席,看看cak怎么样?可以跟进不?
: CAMAC Energy is pleased to announce the spudding and progress of its ZJS-3
: well in China. Drilling is expected to take between 40 and 60 days to reach
: the well’s target depth of between 4,500 and 5,500 feet. Currently the
: penetrating depth is 3,300 feet drilled towards the main target formations.
: Mud logs have already shown gas readings from several penetrated intervals.
相关阅读
fnma我先下车了没人发NQ包子吗?需要GOGOi的美图给大伙消消火气了。盛大GAME是怎么了?全仓无脑爆乳张嘎、、、、、、转基因大米哪里有售,survey: anybody short the index?AVEO这是爆发前的沉默么为啥股版都喜欢关注暴跌股?It might be that Muddy Water was tricked this time...每天来股版都很欢乐我觉得牛市到头了,因为[通知] Stock 主题为<<周五,10/25,S&P涨跌 >>的博彩已开奖尼玛ZNGA又跌回来了周末轻松下歪鸡翼跌得很多教授块看看张嘎怎么办!!!!nugt的多头是不是转去玩nq了?加州州议员都有行动了,联邦议员有行动吗?nq开盘一个多小时