最近ugaz好火,发现大家对ng的热情很高,但是好的FA分析却很少。小青蛙怀着对ng的
热爱和一年来对ugaz的执着, 决定利用一些自己的resource每周花点时间做一下ng行业
的学习分析,希望能抛砖引玉,让更多牛人拿出有质量的分析出来。
今天的topic是LNG,因为LNG的出口增加会对美国国内ng的价格产生影响,所以先从边
角开始吧。下面是2020年之前美国要上马的主要LNG项目,还有一个非常小的Carib
Energy的,几乎可以忽略不计。
1. Sabine Pass, 600 MMCF/Day per train, 4 trains ~ 2.4 BCF/Day, first
train begin production in Dec.2015, and it takes 6-9 months for the rest 3
trains to ramp up. Owned by Cheniere
2. Cove Point, 800 MMCF/Day extended from previous 1.0BCF/Day capacity,
under construction now, expected to finish by end 2017. Owned by Dominion
3. Cameron, 700 MMCF/Day per train, 3 trains ~ 2.1 BCF/Day, first, second
, third train begin production in early, mid and end of 2018. Applying to
extend it to 5 trains, ~ 3.5 BCF in total. Owned by Sampra
4. Freeport, 667 MMCF/Day per train, 3 trains ~ 2.0 BCF/Day, three trains
will begin production and ramp up in 2018. Applying to extend it to 4
trains. ~ 2.67 BCF in total.
5. Corpus Christi, 700 MMCF/Day per train, 2 or 3 trains ~ up to 2.1 BCF/
Day, expected to be online by 2020. Owned by Cheniere
所以如果不算现存的项目,新增的LNG出口在今年冬天只有0.6BCF/Day的增加,一周合4
.2 BCF。然后到明年中下旬,新增的LNG出口将到达2.4 BCF/Day, 合16.8 BCF每周,都
是通过Sabine Pass这个项目。剩下的增量大概要从2017年底2018年才能开始了。(现在
美国的ng产量大约是73BCF/Day, 这几周每周新增库存大约在100BCF以上)。 另外因为
美国的这种项目审批手续非常繁杂,所以需要几年的时间去计划设计申请动工,所以
2020年前不会突然冒出来新的项目了。
另外,看起来LNG在短期内恐怕不会对ng的价格产生重大的影响。
另:下一个想研究的topic是gascoal switching
热爱和一年来对ugaz的执着, 决定利用一些自己的resource每周花点时间做一下ng行业
的学习分析,希望能抛砖引玉,让更多牛人拿出有质量的分析出来。
今天的topic是LNG,因为LNG的出口增加会对美国国内ng的价格产生影响,所以先从边
角开始吧。下面是2020年之前美国要上马的主要LNG项目,还有一个非常小的Carib
Energy的,几乎可以忽略不计。
1. Sabine Pass, 600 MMCF/Day per train, 4 trains ~ 2.4 BCF/Day, first
train begin production in Dec.2015, and it takes 6-9 months for the rest 3
trains to ramp up. Owned by Cheniere
2. Cove Point, 800 MMCF/Day extended from previous 1.0BCF/Day capacity,
under construction now, expected to finish by end 2017. Owned by Dominion
3. Cameron, 700 MMCF/Day per train, 3 trains ~ 2.1 BCF/Day, first, second
, third train begin production in early, mid and end of 2018. Applying to
extend it to 5 trains, ~ 3.5 BCF in total. Owned by Sampra
4. Freeport, 667 MMCF/Day per train, 3 trains ~ 2.0 BCF/Day, three trains
will begin production and ramp up in 2018. Applying to extend it to 4
trains. ~ 2.67 BCF in total.
5. Corpus Christi, 700 MMCF/Day per train, 2 or 3 trains ~ up to 2.1 BCF/
Day, expected to be online by 2020. Owned by Cheniere
所以如果不算现存的项目,新增的LNG出口在今年冬天只有0.6BCF/Day的增加,一周合4
.2 BCF。然后到明年中下旬,新增的LNG出口将到达2.4 BCF/Day, 合16.8 BCF每周,都
是通过Sabine Pass这个项目。剩下的增量大概要从2017年底2018年才能开始了。(现在
美国的ng产量大约是73BCF/Day, 这几周每周新增库存大约在100BCF以上)。 另外因为
美国的这种项目审批手续非常繁杂,所以需要几年的时间去计划设计申请动工,所以
2020年前不会突然冒出来新的项目了。
另外,看起来LNG在短期内恐怕不会对ng的价格产生重大的影响。
另:下一个想研究的topic是gascoal switching