trunk line is a conduit which works as a collector, so the pipe size is
usually big and the the flow rate is high. It is part of the sewer system
with the original design.
Interceptor system usually is built at outfalls to intercept seweage from
discharging to water body directly and then divert seweage to public
treatment works to control SSO/CSO.
Sometimes interceptor system also works as kind of storage tank to reduce
peak runoff and under this situ its size is HUGE.
【在 H******7 的大作中提到】
: RT, 谢谢
usually big and the the flow rate is high. It is part of the sewer system
with the original design.
Interceptor system usually is built at outfalls to intercept seweage from
discharging to water body directly and then divert seweage to public
treatment works to control SSO/CSO.
Sometimes interceptor system also works as kind of storage tank to reduce
peak runoff and under this situ its size is HUGE.
【在 H******7 的大作中提到】
: RT, 谢谢
H*7
3 楼
还是不明白啊。有什么分辨的办法吗?我现在要在map上把他们分别标出来。现在只知
道尺寸。interceptor system包括 15,12,10,8"的,trunk line包括10,8"。按你
的意思,trunk line在图上该是有分支的,interceptor system是没有分支的?
【在 k******k 的大作中提到】
: trunk line is a conduit which works as a collector, so the pipe size is
: usually big and the the flow rate is high. It is part of the sewer system
: with the original design.
: Interceptor system usually is built at outfalls to intercept seweage from
: discharging to water body directly and then divert seweage to public
: treatment works to control SSO/CSO.
: Sometimes interceptor system also works as kind of storage tank to reduce
: peak runoff and under this situ its size is HUGE.
道尺寸。interceptor system包括 15,12,10,8"的,trunk line包括10,8"。按你
的意思,trunk line在图上该是有分支的,interceptor system是没有分支的?
【在 k******k 的大作中提到】
: trunk line is a conduit which works as a collector, so the pipe size is
: usually big and the the flow rate is high. It is part of the sewer system
: with the original design.
: Interceptor system usually is built at outfalls to intercept seweage from
: discharging to water body directly and then divert seweage to public
: treatment works to control SSO/CSO.
: Sometimes interceptor system also works as kind of storage tank to reduce
: peak runoff and under this situ its size is HUGE.
相关阅读
来这个版就老是觉得有点压抑有谁了解Dow Chemical请教个问题。 (转载)salary for post doc PE in env. engzz美国前副总统戈尔与IPCC分享诺贝尔和平奖巨贪800多万被缴深圳环保局原处长被判10年有人对black-veatch这个公司了解吗总结了一下常看的newsletterposition in hydrodynamic/environmental modeling (EFDC)关于密西根州立大学two Bioenergy postdoc Positions, Chinese Academy of Sciences问个phd还是master的问题环境教育应该从环保的人文教育做起[为自己找工作] 土木与环境工程专业中国-山西临汾,安徽界首田营镇荣登全球十大最污染城市Energy Conservation as a Resource有听说过SPR高浊度污水净化系统的吗?关于提交简历也为自己找工作,water resource engineer, GIS Analyst请辞环境版斑竹 (转载)