Redian新闻
>
有人换过shingle吗?
avatar
有人换过shingle吗?# Living
p*a
1
刚进了个户外烤炉。但是没腌制的经验。求推荐腌制用的料或者酱,最好是亚洲风味的
,或者美国口味的也行。
韩国的家里已经成堆了。
多谢啊
avatar
w*e
2
刚刚从律师那里收到AP,就2张一样的纸,好像有人说是3张,
请问大家都是几张?
还有,用的时候,是交一张,留一张盖章的下次用,对吗?
谢谢。
还有,从trackitt看到,NSC EB1B的485都批到11月30号了。
希望大家都早点拿卡。
avatar
t*t
3
Several shingles at the roof valley went bad. Because they're next to the
eave, I can reach them on a ladder (one story) without climbing up to the
roof. The valley is covered in closed-cut style.
Questions:
Is it suitable for DIY?
Usually there is a layer of roofing roll under shingles. After tearing old
shingles, there will be holes left by roof nails. Do I need to patch them?
If yes, by what method?
Are there any suggested readings/books?
Thanks.
avatar
h*r
4
我家烧烤,从来只放现磨的海盐和黑胡椒末。
家里谁喜欢吃酱,等烤好后自己蘸着吃。

【在 p*****a 的大作中提到】
: 刚进了个户外烤炉。但是没腌制的经验。求推荐腌制用的料或者酱,最好是亚洲风味的
: ,或者美国口味的也行。
: 韩国的家里已经成堆了。
: 多谢啊

avatar
A*n
5
两张,都带着就对了

【在 w*********e 的大作中提到】
: 刚刚从律师那里收到AP,就2张一样的纸,好像有人说是3张,
: 请问大家都是几张?
: 还有,用的时候,是交一张,留一张盖章的下次用,对吗?
: 谢谢。
: 还有,从trackitt看到,NSC EB1B的485都批到11月30号了。
: 希望大家都早点拿卡。

avatar
s*y
6
You need to tear down shingles entirely. Before you do that you need to
loose nearby shingles so you can get the under player part off. Then you can
buy a piece of shingle from HD and put it back to replace the old one. You
need to use roof nail to tighten shingles. And use roof chulck covering
nails.

【在 t****t 的大作中提到】
: Several shingles at the roof valley went bad. Because they're next to the
: eave, I can reach them on a ladder (one story) without climbing up to the
: roof. The valley is covered in closed-cut style.
: Questions:
: Is it suitable for DIY?
: Usually there is a layer of roofing roll under shingles. After tearing old
: shingles, there will be holes left by roof nails. Do I need to patch them?
: If yes, by what method?
: Are there any suggested readings/books?
: Thanks.

avatar
L*g
7
李锦记
avatar
t*t
8
Thanks.
However, what you mentioned here is about regular area, i.e. flat surface.
That's much easier.
I read quite a few articles and realized roof valleys are different.For
close-cut valleys, shingles are nailed on surface A, crossing the valley and
nailed down with two more nails on surface B.Those shingles are then
covered by the shingles laid on surface B. Shingles on the top need to be
trimmed at the top corner, cut at the valley center, and sealed with roof
cement. Also,no nails are allowed with 6 inches from the valley.
It seems complicated because to tear off an old shingle, not only two
shingles above that one, but also the shingle on the other side of the
valley need to be manipulated.
avatar
s*y
9
It may be a little bit more complex than the rest of the roof. But the basic
is the same. I had to loose several shingles nearby to replace one bad
shingle. If the valley is not long you may want to just replace all the
singles. You can do it if you know what you suppose to do. At the end you
can do a better job than most of the contractors unless you know a really
good one.

and

【在 t****t 的大作中提到】
: Thanks.
: However, what you mentioned here is about regular area, i.e. flat surface.
: That's much easier.
: I read quite a few articles and realized roof valleys are different.For
: close-cut valleys, shingles are nailed on surface A, crossing the valley and
: nailed down with two more nails on surface B.Those shingles are then
: covered by the shingles laid on surface B. Shingles on the top need to be
: trimmed at the top corner, cut at the valley center, and sealed with roof
: cement. Also,no nails are allowed with 6 inches from the valley.
: It seems complicated because to tear off an old shingle, not only two

avatar
t*t
10
Thanks a lot!
I'm going to borrow a few books, plan in advance and DIY.
相关阅读
logo
联系我们隐私协议©2024 redian.news
Redian新闻
Redian.news刊载任何文章,不代表同意其说法或描述,仅为提供更多信息,也不构成任何建议。文章信息的合法性及真实性由其作者负责,与Redian.news及其运营公司无关。欢迎投稿,如发现稿件侵权,或作者不愿在本网发表文章,请版权拥有者通知本网处理。