Redian新闻
>
Final Walkthrough要注意些什么?
avatar
Final Walkthrough要注意些什么?# Living
C*D
1
The final walk though will be tomorrow morning. The check list I could think
about is shown below. what else should I pay attention to?
1. Go through the repair list items first.
2. Run dish washer, lights, microwave and other appliances listed in the
contract.
3. Flush toilet, turn on shower.
4. Look around house for cracks on the wall, holes, torn carpet, etc.
5. Check attic see if there are water leaks (single family)
6. Go around the house see concrete slabs, decks, and if they are in good
shape.
7. The house should be in broom clean condition
avatar
b*y
2
就是 1,还有看看少了啥没,合同里要留下的
相关阅读
logo
联系我们隐私协议©2024 redian.news
Redian新闻
Redian.news刊载任何文章,不代表同意其说法或描述,仅为提供更多信息,也不构成任何建议。文章信息的合法性及真实性由其作者负责,与Redian.news及其运营公司无关。欢迎投稿,如发现稿件侵权,或作者不愿在本网发表文章,请版权拥有者通知本网处理。