好像长传不了超过1M的附件。以下是需要的parts和步骤: Parts Needed: • (1) Permeate Pump with mounting clip (P/N 152002) • (2) Quick Connect Reducer Union (P/N 125037) • (2) 3” long, 1/4” Blue tubes (P/N 710450) • (1) 48” long, 1/4” blue tube (P/N 610113) • (1) 3/8” Quick Connect Union Tee (P/N 225051) • (1) 3/8” Plug Insert (P/N 164027) NOTE: The Permeate Pump is equipped with ¼” Quick Connect push-to- connect fittings. The pump can be used in RO systems with 3/8” tubing by inserting a short piece of 1/4” tubing into the port on the Permeate Pump and attaching a Quick Connect Reducer Union to the tubing. Also, when mounting the Permeate Pump, make sure the outlet ports of the Permeate Pump are above the inlet ports in order to allow entrapped air to escape Installation Steps: 1. Turn off the incoming water to the reverse osmosis unit. Lift the handle on the reverse osmosis drinking water faucet to drain the water from the system and storage tank. Note: If tank is equipped with a ball valve, close valve to preserve the tank water. 2. Before installing the Permeate Pump, remove the blue tube-inserts from the ports. Refer to the diagram on Page 2 for instructions for disconnecting from a quick-connect fitting. 3. Remove the 3/8” blue tube from the manifold “TANK” port and insert the 3/8” Plug 4. Locate the 3/8” blue tube from the manifold “FAUCET” port and cut approximately 24” from the manifold and re-route into the Permeate Pump “PERMEATE IN” port using a Reducer Union and a 3” long, 1/4” blue tube 5. Insert the 3/8” blue tube from the faucet into the Permeate Pump “ PERMEATE OUT” port using a Reducer Union and a 3” long, 1/4” blue tube 6. Locate the 3/8” blue tube between the faucet and Permeate Pump, and then cut and insert the 3/8” Union Tee. 7. Insert the 3/8” blue tube leading to the tank into the open port of the 3/8” Union Tee 8. Locate the 1/4” red tube between the manifold “DRAIN” port and the faucet air gap inlet and then cut the tube 24” from the manifold (Making sure to leave the flow restrictor plugged into the manifold) Insert the red tube from the manifold into the Permeate Pump “BRINE IN” port and the red tube from the faucet into the Permeate Pump “BRINE OUT” port. 9. Make sure your installation matches the diagram shown in Figure 2 10. Turn on the water supply. Check for leaks periodically for the next 24- 48 hours as the system fills and again after it shuts off when the tanks is full
On April 30, 2014, we mailed you a notice that we have approved this I485 APPLICATION TO REGISTER PERMANENT RESIDENCE OR TO ADJUST STATUS. Please follow any instructions on the notice. If you move before you receive the notice, call customer service at 1-800-375-5283.
【在 F*********u 的大作中提到】 : 恭喜 : 485现在什么状态
B*e
11 楼
最后冲刺前触角那一甩,实在是太给力了!!
p*s
12 楼
cong!
【在 P*****a 的大作中提到】 : On April 30, 2014, we mailed you a notice that we have approved this I485 : APPLICATION TO REGISTER PERMANENT RESIDENCE OR TO ADJUST STATUS. Please : follow any instructions on the notice. If you move before you receive the : notice, call customer service at 1-800-375-5283.
c*7
13 楼
我也好想做一个类似这样的图啊。。。
【在 B********e 的大作中提到】 : 最后冲刺前触角那一甩,实在是太给力了!!
P*a
14 楼
这算啥状态呀? 咋不象人家" we mailed you a notice that we had registered this customer's new permanent resident status. " 或者 card production 啥的呢?还要等多久才能拿到卡呀? 一 个月就要搬家了,真愁人。
【在 P*****a 的大作中提到】 : On April 30, 2014, we mailed you a notice that we have approved this I485 : APPLICATION TO REGISTER PERMANENT RESIDENCE OR TO ADJUST STATUS. Please : follow any instructions on the notice. If you move before you receive the : notice, call customer service at 1-800-375-5283.
【在 P*****a 的大作中提到】 : 这算啥状态呀? 咋不象人家" we mailed you a notice that we had registered : this customer's new permanent : resident status. " 或者 card production 啥的呢?还要等多久才能拿到卡呀? 一 : 个月就要搬家了,真愁人。
e*f
16 楼
一般card production是第一个状态,过几个小时就变成we mailed you a notie啥的。 你可能查晚了,错过了第一个状态。
【在 P*****a 的大作中提到】 : 这算啥状态呀? 咋不象人家" we mailed you a notice that we had registered : this customer's new permanent : resident status. " 或者 card production 啥的呢?还要等多久才能拿到卡呀? 一 : 个月就要搬家了,真愁人。