What are you building? It is cheaper to have the concrete company deliver
them.
For a small job, I usually notify the driver, they will dump the left over
fresh concrete in the mixer on the way back from a job site. $20 for them,
save me the hassle of mixing myself, I build one section at a time, so this
is perfect. I build a lot of side walk that way at 2 to 3 cubic yard at a
time. The bad part is color does not match perfectly, but I can live with
that.
【在 T**J 的大作中提到】![](/moin_static193/solenoid/img/up.png)
: 确切的说是1720lb,然后还去lowes又搬回来720lb,估计也就是1/2的需要量。
them.
For a small job, I usually notify the driver, they will dump the left over
fresh concrete in the mixer on the way back from a job site. $20 for them,
save me the hassle of mixing myself, I build one section at a time, so this
is perfect. I build a lot of side walk that way at 2 to 3 cubic yard at a
time. The bad part is color does not match perfectly, but I can live with
that.
【在 T**J 的大作中提到】
![](/moin_static193/solenoid/img/up.png)
: 确切的说是1720lb,然后还去lowes又搬回来720lb,估计也就是1/2的需要量。
m*y
4 楼
//nod.
If you need more than a shovel, the delivery is cheaper by volume.
this
【在 g*****9 的大作中提到】![](/moin_static193/solenoid/img/up.png)
: What are you building? It is cheaper to have the concrete company deliver
: them.
: For a small job, I usually notify the driver, they will dump the left over
: fresh concrete in the mixer on the way back from a job site. $20 for them,
: save me the hassle of mixing myself, I build one section at a time, so this
: is perfect. I build a lot of side walk that way at 2 to 3 cubic yard at a
: time. The bad part is color does not match perfectly, but I can live with
: that.
If you need more than a shovel, the delivery is cheaper by volume.
this
【在 g*****9 的大作中提到】
![](/moin_static193/solenoid/img/up.png)
: What are you building? It is cheaper to have the concrete company deliver
: them.
: For a small job, I usually notify the driver, they will dump the left over
: fresh concrete in the mixer on the way back from a job site. $20 for them,
: save me the hassle of mixing myself, I build one section at a time, so this
: is perfect. I build a lot of side walk that way at 2 to 3 cubic yard at a
: time. The bad part is color does not match perfectly, but I can live with
: that.
c*o
5 楼
套套又要干啥?做deck吗
h*y
6 楼
Gee,老大,你总能给些很有创意的省钱的点子
我拿小本记下啦。
this
【在 g*****9 的大作中提到】![](/moin_static193/solenoid/img/up.png)
: What are you building? It is cheaper to have the concrete company deliver
: them.
: For a small job, I usually notify the driver, they will dump the left over
: fresh concrete in the mixer on the way back from a job site. $20 for them,
: save me the hassle of mixing myself, I build one section at a time, so this
: is perfect. I build a lot of side walk that way at 2 to 3 cubic yard at a
: time. The bad part is color does not match perfectly, but I can live with
: that.
我拿小本记下啦。
this
【在 g*****9 的大作中提到】
![](/moin_static193/solenoid/img/up.png)
: What are you building? It is cheaper to have the concrete company deliver
: them.
: For a small job, I usually notify the driver, they will dump the left over
: fresh concrete in the mixer on the way back from a job site. $20 for them,
: save me the hassle of mixing myself, I build one section at a time, so this
: is perfect. I build a lot of side walk that way at 2 to 3 cubic yard at a
: time. The bad part is color does not match perfectly, but I can live with
: that.
T*J
8 楼
竖post呢,每天也就需要700、800磅,量太小。
this
【在 g*****9 的大作中提到】![](/moin_static193/solenoid/img/up.png)
: What are you building? It is cheaper to have the concrete company deliver
: them.
: For a small job, I usually notify the driver, they will dump the left over
: fresh concrete in the mixer on the way back from a job site. $20 for them,
: save me the hassle of mixing myself, I build one section at a time, so this
: is perfect. I build a lot of side walk that way at 2 to 3 cubic yard at a
: time. The bad part is color does not match perfectly, but I can live with
: that.
this
【在 g*****9 的大作中提到】
![](/moin_static193/solenoid/img/up.png)
: What are you building? It is cheaper to have the concrete company deliver
: them.
: For a small job, I usually notify the driver, they will dump the left over
: fresh concrete in the mixer on the way back from a job site. $20 for them,
: save me the hassle of mixing myself, I build one section at a time, so this
: is perfect. I build a lot of side walk that way at 2 to 3 cubic yard at a
: time. The bad part is color does not match perfectly, but I can live with
: that.
相关阅读
端午节版上总该发粽子了吧?浴室瓷砖之间裂开了买家用电器和家具如何省钱?5000刀以上房屋保险after claim哪里有座位舒服点的自行车卖?大家的房屋保险是多少?LIVING版和军版的差别新房裂纹问题请教,谢谢。买房多久以后可以refinance?现在no cost no point的refinance rate能做到多少 (>625k)?房屋保险的 deductable 放多少合适完美草坪 seeding 计划和步骤lock rate的问题deck 重新刷漆问题求指教很多蚂蚁窝,怎么办?地下室的流水声本版六一儿童节有包子的吧?包子问irrigation system failed买55万的房子,家庭收入多少万,不算硬撑?问一个关于铺木地板时的切割问题Lowe's定的橱柜到了,才现在他们测量的尺寸错了,橱柜放不下。。。。