Construction Observation Report
On x.X 2012, I inspected the structural repairs at the above referenced
property. The purpose of the inspection was to observe the exposed
counterfor, in order to determine whether additional repair is necessary....
Observations & opinions:
One of the two existing counterforts was exposed. I understand from the
contractor that upon excavation it was discovered that the void space under
the counterfort was completely closed and applying pressure to the underside
of the counterfort. I also understand that the constractor removed the soil
from under the counterfort and that the wall released somewhat.
Interior inspection in the basement confirms that the wall has shifted back
slightly.
In my opinion, at this time, the second counterfort should be exposed and
void space under each counterfort should be established to a depth of 12
inches. Replacement of the helical piers with micropiles, is not considered
necessary. Void retention should be installed, and the excavations should be
backfilled with non-expansive soil.
No other work is considered necessary.
...
房主是03年买的房,然后06年进行过一次structural repair.06年的维修之后也有一个
报告:
...
The purpose of the reviews was to provide inspection of structural repair
work per the plan of repair prepared by XXX...
Three deviations were implemented in lieu of the plan of repair: 1) the
helical piers were installed to a depth of 20-feet versus 30-feet, 2) knee
wall was adjusted to a plumb orientation versus installing additional 2x6
studs and 3) the steel pier located below the basement stairway was
relocated to the exterior of the grade beam versus the interior. XX was made
aware of the deviations and approved suc deviations. All structural repair
work was found to be general compliance with the plan of repair with the
deviations as noted above.
Additional inspection of the existing concrete piers at the south side of
the basement was performed as a courtesy to the homeowner. There was no
significant distress at the pier/grade beam interface that would suggest
structural problems with the piers....
有过两次structural repair的这个房子可以下offer不???
就有多个offer了。
最近新出来一个房子,价格合理,位置不错,看过了户型结构也满意。只是看到zillow
上咋个房子上半年卖过一次,然后又撤了,过了四个月才又出来卖。让agent帮忙查一
下背景。
Agent动作很快。原来上次有过offer,结果inspection 发现structural的问题,就撤了
。房主这几个月把上次查出的问题进行了structural repair,并由同一个inspector出
具了一个报告,说明上次的问题已经解决,所以又可以上市了。我们自己看不出问题,
报告上的术语也是大概猜测,有懂行的帮忙看一下吧
Construction Observation Report
On x.X 2012, I inspected the structural repairs at the above referenced
property. The purpose of the inspection was to observe the exposed
counterfor, in order to determine whether additional repair is necessary....
Observations & opinions:
One of the two existing counterforts was exposed. I understand from the
contractor that upon excavation it was discovered that the void space under
the counterfort was completely closed and applying pressure to the underside
of the counterfort. I also understand that the constractor removed the soil
from under the counterfort and that the wall released somewhat.
Interior inspection in the basement confirms that the wall has shifted back
slightly.
In my opinion, at this time, the second counterfort should be exposed and
void space under each counterfort should be established to a depth of 12
inches. Replacement of the helical piers with micropiles, is not considered
necessary. Void retention should be installed, and the excavations should be
backfilled with non-expansive soil.
No other work is considered necessary.
...
房主是03年买的房,然后06年进行过一次structural repair.06年的维修之后也有一个
报告:
...
The purpose of the reviews was to provide inspection of structural repair
work per the plan of repair prepared by XXX...
Three deviations were implemented in lieu of the plan of repair: 1) the
helical piers were installed to a depth of 20-feet versus 30-feet, 2) knee
wall was adjusted to a plumb orientation versus installing additional 2x6
studs and 3) the steel pier located below the basement stairway was
relocated to the exterior of the grade beam versus the interior. XX was made
aware of the deviations and approved suc deviations. All structural repair
work was found to be general compliance with the plan of repair with the
deviations as noted above.
Additional inspection of the existing concrete piers at the south side of
the basement was performed as a courtesy to the homeowner. There was no
significant distress at the pier/grade beam interface that would suggest
structural problems with the piers....