Redian新闻
>
请问请professional去popcorn ceiling一定要申请permit吗?
avatar
请问请professional去popcorn ceiling一定要申请permit吗?# Living
a*0
1
今天call了local licensed 去popcorn 的公司,说了估价+permit fee $600. 请问
permit一定要申请吗?房子是空的,准备卖。
多谢。
avatar
s*i
2
多老的房子?
avatar
s*s
3
不懂,
这个都要permit的啊..

【在 a*****0 的大作中提到】
: 今天call了local licensed 去popcorn 的公司,说了估价+permit fee $600. 请问
: permit一定要申请吗?房子是空的,准备卖。
: 多谢。

avatar
L*P
4
permit is required for removing asbestos materials
however, I doubt that the goverment is charging $600 for a permit. Maybe
your contractor is ripping you off for this.

【在 a*****0 的大作中提到】
: 今天call了local licensed 去popcorn 的公司,说了估价+permit fee $600. 请问
: permit一定要申请吗?房子是空的,准备卖。
: 多谢。

avatar
L*P
5
yes, if it contains asbestos.

【在 s******s 的大作中提到】
: 不懂,
: 这个都要permit的啊..

avatar
a*0
6
谢谢。那家公司说要去bay area air quality Management District in San
Francisco 申请permit.

【在 L**P 的大作中提到】
: permit is required for removing asbestos materials
: however, I doubt that the goverment is charging $600 for a permit. Maybe
: your contractor is ripping you off for this.

avatar
s*i
7
既然知道在哪申请,自己打个电话问问呗,一问是否需要,二问多少钱

【在 a*****0 的大作中提到】
: 谢谢。那家公司说要去bay area air quality Management District in San
: Francisco 申请permit.

avatar
L*P
8
do you know the absestos concentration in your popcorn ceiling?
call that goverment branch directly to see if it is required
ask for the price of a permit. My guess, It will take sometime, about one week? for you to get the permit

【在 a*****0 的大作中提到】
: 谢谢。那家公司说要去bay area air quality Management District in San
: Francisco 申请permit.

avatar
a*0
9
I sent a sample to a local lab and was tested to contain 5% asbestos.
I just called the agency, and was told a permit is required and it will take
about 2 weeks. For the popcorn area between 500-1000 sq ft, the permit fee
is $570, and for the size of 1000-2000 sq ft, the fee will be $829. In my
case it should be $829.This morning I got the quote from the certified
popcorn removal professional, who was busy on a site, through the phone. The
$600 permit fee he said was just an estimate.

【在 L**P 的大作中提到】
: do you know the absestos concentration in your popcorn ceiling?
: call that goverment branch directly to see if it is required
: ask for the price of a permit. My guess, : It will take sometime, about one week? for you to get the permit

avatar
L*P
10
Wow, so it is the goverment (not the contractor) ripping offf you. It is
kind of fee for dumping hazardous materials. The contractor needs to wrap up
and label the trash and send it to specific disposal sites.
The contractor will send you a certificate of complete work. Keep it for
record.

take
fee
The

【在 a*****0 的大作中提到】
: I sent a sample to a local lab and was tested to contain 5% asbestos.
: I just called the agency, and was told a permit is required and it will take
: about 2 weeks. For the popcorn area between 500-1000 sq ft, the permit fee
: is $570, and for the size of 1000-2000 sq ft, the fee will be $829. In my
: case it should be $829.This morning I got the quote from the certified
: popcorn removal professional, who was busy on a site, through the phone. The
: $600 permit fee he said was just an estimate.

avatar
a*0
11
Thank you.

up

【在 L**P 的大作中提到】
: Wow, so it is the goverment (not the contractor) ripping offf you. It is
: kind of fee for dumping hazardous materials. The contractor needs to wrap up
: and label the trash and send it to specific disposal sites.
: The contractor will send you a certificate of complete work. Keep it for
: record.
:
: take
: fee
: The

相关阅读
logo
联系我们隐私协议©2024 redian.news
Redian新闻
Redian.news刊载任何文章,不代表同意其说法或描述,仅为提供更多信息,也不构成任何建议。文章信息的合法性及真实性由其作者负责,与Redian.news及其运营公司无关。欢迎投稿,如发现稿件侵权,或作者不愿在本网发表文章,请版权拥有者通知本网处理。